Scheduled Power Interruption (October 31, 2020)

When: OCTOBER 31, 2020 SATURDAYTime: 9:00AM - 5:00PM

Reason/s of Interruption:
1. To conduct (8) rotten pole replacement
2. (7) Cross-arm replacement with conversion of structure in preparation for the reconductoring of Tabina Three-Phase Primary Backbone Line from #0/2 Bare wire ACSR to #4/10 Bare Wire ACSR

Affected areas of:
TABINA
• Brgy. Abong-Abong
• Brgy. Poblacion
• Brgy. Mabuhay
• Brgy. Lumbia
• Brgy. Malim

As a safety precaution, please always consider the power lines energized during this power interruption. Power will be immediately restored upon completion of the scheduled works, which depending on the circumstance, MAY NOT BE IN ACCORDANCE WITH THE TIME SPECIFIED.