Scheduled Power Interruption (November 14, 2020)

When: NOVEMBER 14, 2020 SATURDAYTime: 6:00AM - 2:00PM

Affected areas:
• Entire Municipality of SAN PABLO
• Entire Municipality of GUIPOS
• Entire Municipality of SAN MIGUEL
• Entire Municipality of LAPUYAN
• Entire Municipality of VINCENZO SAGUN
• Entire Municipality of MARGOSATUBIG
• Entire Municipality of DINAS
• Entire Municipality of DIMATALING
• Entire Municipality of PITOGO
• Entire Municipality of TABINA

Reason/s of Interruption:
1. Setting up the SF6 Live Tank at platform, lay-outing, installation of wirings and testing
2. Correction of Hotspot
3. Replacement of suspension insulators from quadrangle to first pole to all three feeders.

Power will be restored without prior notice as soon as the maintenance works are completed. Please take the necessary preparations and precautions in anticipation of this scheduled power interruption.

Thank you.


Warning: count(): Parameter must be an array or an object that implements Countable in /homepages/24/d832250832/htdocs/public_html/templates/burmont/html/com_k2/templates/default/item.php on line 160