Scheduled Power Interruption (November 21, 2020)

When: NOVEMBER 21, 2020 SATURDAYTime: 9:00AM - 5:00PM

Reason/s of Interruption:
1. To conduct Phase 3 replacement of 9 rotten poles
2. To conduct replacement of 7 crossarms with conversion structure
3. To relocate 2 poles affected by road widening located at Brgy. Tinggabulong, Dimataling and Brgy. Culabay, Tabina in preparation for the reconductoring of Tabina Phase Primary Backbone Line from #0/2 bare wire ACSR to #4/0 bare wire ACSR.

Affected areas:
☑️ Entire Municipality of Tabina

PITOGO
☑️ Brgy. Tongao
☑️ Brgy. Matin-ao
☑️ Brgy. Limbayan
☑️ Brgy. Punta Flecha
☑️ Brgy. Upper Panikian
☑️Brgy. Colojo

DIMATALING
☑️ Portion of Brgy. Kagawasan
☑️ Brgy. Balanagan
☑️ Brgy. Buburay
☑️ Brgy. Tingabulong

As a safety precaution, please always consider the power lines energized during the power interruption. Power will be immediately restored upon completion of the scheduled works. Please take the necessary preparations and precautions in anticipation of this scheduled power interruption.

Thank you.


Warning: count(): Parameter must be an array or an object that implements Countable in /homepages/24/d832250832/htdocs/public_html/templates/burmont/html/com_k2/templates/default/item.php on line 160